Address
5/F, No. 438 Sec. 2 Zhongqing Load,
Taichung City, Taiwan
Work Hours
Monday to Friday: 9AM - 7PM
Weekend: 9AM - 1PM
Address
5/F, No. 438 Sec. 2 Zhongqing Load,
Taichung City, Taiwan
Work Hours
Monday to Friday: 9AM - 7PM
Weekend: 9AM - 1PM
This wiring loom / cable set can be directly installed with uxiliary gauges set mounted on upper din.
The entrie installation process is very simple. You only need to take off the connector housing that originally connect to the cigarette lighter and control panel lights, and then connect to this loom /cable. The power will be hense taps to the gauges and the lights.
Reviews
There are no reviews yet.